Bossert Hotel WiFi Deployment.

EM IT Bossert Hotel WiFi Deployment

EM IT. Recently did The Bossert Hotel WiFi Deployment. The Bossert is a boutique hotel with 300 rooms. locate at 98 Montague Street in Brooklyn Heights, NY.

The wiring of the entire building was performed in the summer 2013.

After the wiring was done, we proceed with the cat6 keystone jacks punching down.

Network Jack for access points cat6 The Bossert

Network Jack for access points cat6 The Bossert

After the wiring and jacks were done, all the cable for the bossert hotel WiFi deployment were inspected and certified using the best certification tool in the market. The Fluke DTX 1200. This is an amazing tool. It can detect shortage of cable. cuts, damage cable, cross connected jacks, and much more information.

Cable certification With Fluke DTX 1200

Cable certification With Fluke DTX 1200.

For such a great project we couldn’t go with just any access points. We advice our customer to go with “Rucku R700 Wireless Access Points”. The performance of this wireless access points is amazing. And in conjunction with the zone director made the Bossert Hotel WiFi Deployment, so easy.

AP used in The Bossert Hotel Brooklyn, WiFi Deployment.

AP used in The Bossert Hotel Brooklyn, WiFi Deployment.

Once we had the cable certified and the jacks done, we were able to ceiling mount the “Rucku R700” in every one of the 13 floors of “The Bossert Hotel”. We love working with Rucku devices. But  we have to say, is a little tricky to ceiling mount this devices, it takes a little of patient to find the keyhole and securely attach the bracket to the caddy.

But once is done, they look beautiful in the ceiling.

Rocku Ceiling Mounted Access Point Bossert Hotel WiFi Deployment

Rocku Ceiling Mounted Access Point Bossert hotel wifi deployment

This is the rack where we installed the zone director for the Bossert hotel wifi deployment. The Zone Director 3050 has the capability to work with either copper or fiber optics feeds. For this project we are using fiber optics feeds from the main data closet to each data closet in the 13 floors of the hotel.

Data Rack located in the data closet

We also deployed the Phone System for this hotel. you can see our “NEC Phone System Deployment Bossert Hotel” Post here.